ExcavationWe can handle all of your excavation needs for projects big or small whether it be asphalt, concrete, dirt or rock. Asphalt PavingOur asphalt paving crew can handle any hot mix asphalt project from patching small potholes to the complete resurfacing of roads and parking lots. ConcreteOur concrete crew has experience with all types of projects including sidewalks, curb and gutter, pavement and footings. Containment RepairWe can handle all types of containment projects ranging from existing slope repairs to new berm construction. 1414 West Anthony Drive Urbana, IL 61802 217-974-7992 office 217-356-1539 fax Secondary Containment New stone on slopes of secondary containment areas of Marathon Terminal in Steubenville, OH (2015) Excavated two feet of contaminated clay cap inside secondary containment area around Tank 18 at Marathon TRD Refinery in Texas City, TX (2015) New compacted clay cap inside secondary containment area around Tank 18 at Marathon TRD Refinery in Texas City, TX (2015) Existing secondary containment area around Tanks 14, 15 & 16 at Marathon TRD Refinery in Texas City, TX (2015) Finished containment area around Tanks 14, 15 & 16 with 8 ounce nonwoven geotextile fabric and 6 inches of stone at Marathon TRD Refinery in Texas City, TX (2015) Existing secondary containment area around Tank 1257A at Equistar Chemical in Tuscola, IL (2013) Finished secondary containment area graded to drain properly with 8 ounce nonwoven geotextile fabric and 6 inches of new stone around Tank 1257A at Equistar Chemical in Tuscola, IL (2013) Existing secondary containment area around Tank 1257A at Equistar Chemical in Tuscola, IL (2013) Finished secondary containment area graded to drain properly with 8 ounce nonwoven geotextile fabric and 6 inches of new stone around Tank 1257A at Equistar Chemical in Tuscola, IL (2013) Existing slope of secondary containment area at Marathon Terminal in Steubenville, OH (2015) Removing existing fabric from slope of secondary containment area at Marathon Terminal in Steubenville, OH (2015) Utilizing existing stone to shape and stabilize the slopes of secondary containment areas at Marathon Terminal in Steubenville, OH (2015) Compacting slopes of the secondary containment areas at Marathon Terminal in Steubenville, OH (2015) New 8 ounce nonwoven geotextile fabric on compacted slopes of secondary containment area at Marathon Terminal in Steubenville, OH (2015) Erosion Control Installing approximately 3’ of new rip rap along the riverbank of the Marathon Barge Terminal in Kenova, WV (2016) Installing 8 ounce nonwoven geotextile fabric before 3’ of rip rap at Marathon Barge Terminal in Kenova, WV (2016) Finished Rip Rap on riverbank slope at the Marathon Barge Terminal in Kenova, WV (2016) Finished Rip Rap on riverbank slope at the Marathon Barge Terminal in Kenova, WV (2016) Existing storm water detention pond slope at Marathon Tri-State Terminal in Kenova, WV (2016) 6” of new stone on the storm water detention pond slope at Marathon Tri-State Terminal in Kenova, WV (2016) Drainage Dirt graded to drain away from tank chime at Marathon Tank Farm in Kenova, WV (2014) Installed new 4” underdrain at Marathon Tank Farm in Kenova, WV (2014) Tied underdrain into existing catch basin at Marathon Tank Farm in Kenova, WV (2014) Backfilled trench with washed stone at Marathon Tank Farm in Kenova, WV (2014) Storm Sewer Installing new gate valve and hardware inside Marathon Terminal at Marietta, OH (2016) Assembling new gate valve and hardware inside Marathon Terminal at Marietta, OH (2016) Completed gate valve on existing storm sewer pipe inside Marathon Terminal at Marietta, OH (2016) Existing storm sewer drain pipe inside Marathon Terminal at Marietta, OH (2016) Asphalt Paving Paving new entrance to Marathon Terminal in Wellsville, OH (2016) Paving new entrance to Marathon Terminal in Wellsville, OH (2016) Paving 2” mill and overlay of main plant road at Solvay USA facility in Spartanburg, SC (2016) Paving 2” mill and overlay of main plant road at Solvay USA facility in Spartanburg, SC (2016) Paving 2” mill and overlay of main plant road at Solvay USA facility in Spartanburg, SC (2016) Paving 2” mill and overlay of main plant road at Solvay USA facility in Spartanburg, SC (2016) Paving new entrance to Marathon Terminal in Wellsville, OH (2016) Paving new entrance to Marathon Terminal in Wellsville, OH (2016) Asphalt Patching Paving 2” Overlay Patch at Marathon Terminal in Wellsville, OH (2016) Finished Asphalt Patch at Marathon Terminal in Wellsville, OH (2016) Priming for Overlay at Marathon Terminal in Wellsville, OH (2016) Paving 2” Overlay Patch at Marathon Terminal in Wellsville, OH (2016) Concrete Pouring and finishing 9” concrete slab for new load rack lane at Marathon Terminal in Wellsville, OH (2016) Pouring and finishing 9” concrete slab for new load rack lane at Marathon Terminal in Wellsville, OH (2016) Finished new concrete load rack lanes at Marathon Terminal in Wellsville, OH (2016) Pouring and finishing 9” concrete slab for new load rack lane at Marathon Terminal in Wellsville, OH (2016) Demolition Using small breaker attachment on skid steer to bust existing concrete at Marathon Terminal in Wellsville, OH (2016) Using large breaker attachment on excavator to bust existing concrete curb at Marathon Terminal in Wellsville, OH (2016) Tearing out existing asphalt pavement at the entrance to Marathon Terminal in Wellsville, OH (2016) – Tearing out existing middle concrete load racks at Marathon Terminal in Wellsville, OH (2016) Milling 2” of existing asphalt at Marathon Terminal in Wellsville, OH (2016) Removal of existing middle concrete load racks at Marathon Terminal in Wellsville, OH (2016) – Saw cutting existing pavement at Marathon Terminal in Wellsville, OH (2016) Using rock saw to cut existing pavement at Marathon Terminal in Wellsville, OH (2016) Widen Walkway Existing narrow walkway inside Marathon Tank Farm in Kenova, WV (2014) Added dirt and reshaped walkway then covered with 8 ounce nonwoven geotextile fabric and 6 inches of stone inside Marathon Tank Farm in Kenova, WV (2014) Gravel Parking Lot Lot 1 – Stripped sod down to down to dirt to create stone parking area at Marathon Barge Terminal in Kenova, WV (2016) Lot 2 – Finished stone parking area at Marathon Barge Terminal in Kenova, WV (2016)